RPOPlaybookDelivery

How to structure a 6-role RPO without losing your mind

Klyver Team · August 2026
🇲🇽 Leer en español →

RPO vs. multiple placements

When a client hands you 6 roles at once, the temptation is to treat them as 6 independent placements. That is the most common mistake. A real RPO has central coordination, unified visibility and a reporting rhythm the client anticipates.

Week 0: the kickoff that matters

An RPO kickoff should produce four concrete deliverables before the recruiter opens LinkedIn:

The pipeline chain

Categorise the 6 roles into three groups: Critical (60% of sourcing time), Important (30% of the time) and Planned (10% of the time). Review this prioritisation weekly.

The weekly report

An effective RPO report fits on one screen with no scroll: role, current stage, active candidates, next action and date. The client should be able to read it in 3 minutes. Detailed profiles live in the portal, the executive report is for the sponsor to make decisions, not to demonstrate work.

When something gets stuck

On a 6-role RPO, at least one will get stuck. The protocol: immediate notification to the sponsor (do not wait for the weekly report), a concrete proposed adjustment (not just the problem), and documentation of the change. RPOs die from a lack of proactive communication, not from the problems themselves.

Keep reading

What is an ATS?Recruitment fee modelsWhat is RPOAll articles

See it working in your operation.

14-day free trial. No credit card. Setup in 10 minutes.

Start free trial →